Our Services

Architect-led support for Part B and Part M compliance, from early design review through certification applications and construction-stage sign-off. We work with your team to identify risks early, keep designs on track, and deliver authority-ready documentation.

Woman pointing at fire exit sign while two men, one in a wheelchair, listen in a modern hallway.
Services

What we offer

Architect-led support across the full compliance journey.

Person marking a building floor plan with a red pen, highlighting fire exit routes and emergency egress paths.
Fire safety

Part B fire safety compliance review

Early risk identification and compliant strategy advice.

Certificate with a red CERTIFIED stamp placed on top of paperwork on a wooden desk with a person's hands and pen nearby.

Fire safety certificate support

Authority-ready documentation and submission support.

Wet, accessible metal ramp with handrails leading to a modern building entrance on a rainy day.

Part M disability access compliance review

Practical inclusive design guidance and usability checks.

Accessible bathroom with wall-mounted sink, toilet with stainless steel grab bars, red emergency pull cord, and frosted window.
Accessibility

Disability access certificate support

DAC-focused documentation and submission clarity.

Worker in a yellow safety vest inspecting a closed door in a hallway while holding a clipboard.
Audits

Audits and assessments for existing buildings

Risk grading, gap analysis, and remedial roadmaps.

Worker in a yellow safety vest peering through a window in grey double doors inside a corridor.

Inspections, records and BC(A)R support

Construction-stage compliance tracking and close-out.

Fire safety

Part B fire safety compliance review

We review your proposals against Part B requirements early, identify key risks before they compound, and advise on compliant strategies that respect your design intent. Our team coordinates directly with yours to keep decisions clear and documented.

What we do

Review against Part B, identify risks, advise on strategy, coordinate with your team.

Typical outputs

Concise report, marked-up drawings, action list, key decision log.

Man marking architectural floor plans with red pen at a wooden desk near a window in an office.
Documents titled Fire Safety Certificate Application and Fire Safety Certification Application with floor plans, a mechanical pencil, a slide rule, and part of a laptop on a white desk.
Fire safety

Fire safety certificate support

We assemble the technical inputs your FSC application needs, align drawings and specifications with your fire safety strategy, and respond to authority queries quickly. Design changes stay controlled and documented throughout.

What we do

Assemble inputs, align drawings, respond to queries, control changes.

Typical outputs

Submission-ready pack, compliance narrative, coordinated markups and checklists.

Accessibility

Part M disability access compliance review

We review your layouts and routes for accessible circulation, check entrances and sanitary provision, and test wayfinding principles for real usability. You get a clear report with marked-up drawings and priority fixes that work with your design.

What we do

Review layouts, routes, entrances, sanitary provision, circulation, wayfinding.

Typical outputs

Report, marked-up drawings, clear priority fixes.

Modern office lobby with large glass windows, concrete walls, gray tile floor, a wooden reception desk with white front panel, and a blue carpet runner.
Architectural drawing of a ramp showing handrail height, 1:12 gradient, tactile paving, and level change annotations with a hand holding a red pencil.
Accessibility

Disability access certificate support

We review your DAC submission inputs before they go to the authority, tighten details that could trigger queries, and support you through any updates or responses needed. Your drawings stay coordinated and your timeline stays on track.

What we do

Pre-submission review, detail tightening, response support.

Typical outputs

DAC submission inputs, compliance notes, coordinated drawings checklist.

Audits

Audits and assessments for existing buildings

We assess fire safety and access compliance on operational sites, grade risks by priority, and give you a clear roadmap for remedial work. Gap analysis and documentation review included.

What we do

Fire safety audits, access audits, gap analysis, risk grading.

Typical outputs

Audit report with risk grading, remedial roadmap, evidence checklist.

A man in dark clothing holding a flashlight shines light on a wall in a dim hallway with peeling paint and worn floors.
Construction worker in a yellow safety vest and white helmet taking a photo inside a concrete building under construction.
Construction

Site inspections and compliance evidence tracking

We inspect on site as required, document compliance evidence in real time, and work with your contractors and design team to resolve practical issues before sign-off. Everything is tracked, photographed, and ready for certification.

What we do

Site inspections, evidence tracking, issue resolution, sign-off support.

Typical outputs

Inspection notes, photo logs, compliance record pack, close-out checklist.

Outputs

What you'll receive

Everything needed to move forward with confidence.

Marked-up drawings with clear action priorities

Every sheet annotated. Every decision logged for your team to act on.

Compliance findings for Part B and Part M

Concise, focused. No fluff. Just what matters for your project.

Submission-ready FSC and DAC documentation packs

Technical inputs assembled and coordinated for authority submission.

Site inspection notes and photographic evidence logs

Real-time compliance tracking throughout construction. Nothing missed.

Three professionals collaborating over architectural blueprints on a conference room table.
Reports

Close-out checklist for certification readiness

Everything confirmed and documented. Ready for sign-off.

Workflow

How we move from brief to sign-off

Send and scope

You send drawings and brief. We scope the work and quote.

Review and advise

We identify risks, propose strategy, flag key decisions early.

Coordinate and iterate

We mark up drawings, work with your team, keep momentum.

Submit and support

We assemble FSC or DAC inputs, respond to queries, stay aligned.

Checklist

What to send us

Have these ready for a fast quote.

Site address and county

Tells us where the project sits.

Building use and occupancy type

Healthcare, education, residential, commercial.

Current project stage

Concept, planning, technical, or construction.

Plans, sections, and elevations

The clearer the drawings, the faster we move.

Project timeline 2024 pinned to corkboard showing tasks and deadlines with a highlighted note for critical deadline on October 31.
Timeline

Key deadlines and programme dates

Prior reports or authority feedback speeds things up too.

Questions

Find answers to common questions about our compliance services.

Can you support us at pre-planning?

Yes. Early review catches risks before design is locked in. We can advise on compliant strategies that fit your vision, saving time and cost later.

Do you work directly with architects?

We do. We coordinate with your design team throughout, marking up drawings and flagging decisions in real time. No surprises at submission.

What affects FSC and DAC timelines?

Clarity of design, completeness of drawings, and how quickly authority queries are resolved. We keep things moving by assembling inputs early and responding fast.

Can you review changes during construction?

Absolutely. We inspect as needed, track compliance evidence, and work with your team to resolve practical issues. Nothing gets signed off without our sign-off.

Do you audit existing buildings?

Yes. We assess fire safety and access compliance on operational sites, grade risks, and give you a prioritised roadmap for remedial work.

What do you need to start?

Project address, building use, stage, plans, sections, elevations, and your deadlines. Any prior reports or feedback from authorities helps too.

Get your quote

Clear scope, clear deliverables, collaborative delivery.

Person typing on a laptop keyboard at a white table with blurred people and chairs in the background.